Casual labour is work engaged by the day or task rather than on a permanent contract. Most fundis on a Kenyan construction site are casual labour, paid at the end of the day or week.

Construction in Kenya is built mostly by casual labour. A fundi is engaged for a day, a task or a week and paid accordingly. Casual does not mean unrecorded, though — wages, days and deductions still need a paper trail.

Updated October 17, 2026 · Glossary

What makes work casual

Casual labour is engaged without a long-term contract, often by the day or for a defined task. The worker may be called back the next day if there is work. It is the norm for masons, helpers and general hands on Kenyan sites.

Rights that still apply

Casual status does not remove basic rights. Employers are expected to keep records of wages and days worked, pay at least the gazetted minimum wage for the trade and municipality, deduct statutory contributions such as PAYE, NSSF and SHIF where they apply, and provide a payslip.

Why the record matters

Casual labour moves fast, so the site record is the only thing that keeps wages honest. A locked digital muster roll shows who actually worked and for how long, which protects the fundi's pay and the contractor's costs at the same time.

Frequently asked questions

Are casual workers entitled to minimum wage?

Yes. Casual construction labour should be paid at least the gazetted minimum wage for the relevant trade and municipality. Rates are reviewed annually, so check the current wage order.

Do casual workers get a payslip?

Employers should give workers a record of their pay. On FundiPay each casual fundi receives a digital payslip by M-Pesa showing gross pay and any statutory deductions.

Can casuals be paid in cash?

Cash is still common but hard to evidence. Paying wages by M-Pesa B2C gives every worker an SMS and a traceable record, which is safer for both the fundi and the contractor.

Keep reading

Pay every fundi on Friday

Direct M-Pesa B2C, geofenced muster rolls and a 14-day payroll float — built for Kenyan construction sites. Bila ya kutoa.