Skip to content
FundiPay

Construction Payroll in Machakos

Machakos is two construction markets in one. Along the Nairobi–Mombasa highway, Athi River and Mlolongo form a belt of warehouses, factories, yards and logistics parks that never really stops building. Inland, Machakos town and the county's devolved projects run at their own pace, with labour drawn in from Kitui, Kangundo and Wote. Both markets share the same weakness: long-distance supervision and a payroll nobody can fully verify from head office.

Updated October 17, 2026 · Locations

Why Machakos payroll is hard to audit

The industrial belt along the highway is huge, scattered and heavily subcontracted. A main contractor may have a shell going up in Mlolongo, a yard in Athi River and a county job in Machakos town, each trusted to a different foreman. Attendance written in three paper books is three sets of numbers nobody can reconcile. Inland, the same problem appears in a different form: sites are far from the county offices, and verification means a long drive.

  • Three or four sites under different foremen with no shared record.
  • Subcontractors and gangs paid by lump sum, not by worker.
  • Labour travelling in from Kitui, Kangundo and Wote with unverified days.
  • County projects where records have to be produced on request.

How FundiPay runs a Machakos payroll

Each site gets its own 50-metre geofence, whether it is a logistics park in Mlolongo, a warehouse in Athi River or a county project in Machakos town. Workers check in by OTP from their own phones, the foreman locks the day's muster roll, and the contractor approves payroll remotely. Wages go out as direct M-Pesa B2C payments to each fundi, so a worker based in Kitui or Wote is paid on their own phone. M-Pesa works countrywide, which removes geography as an excuse entirely.

One account across both markets

Contractors running highway-belt and inland projects use FundiPay as a single source of truth. Every site has its own geofence, foreman logins and locked muster roll, but the contractor sees one consolidated payroll and one deduction schedule.

Subcontractor and gang payments are handled the same way: the gang leader has a verified record, and the workers in the gang can be paid individually rather than through one lump sum that nobody can break down later.

The 14-day payroll float

Large industrial and county projects pay on certificates and valuations, which rarely line up with a Friday wage bill. FundiPay's payroll float covers up to 14 days of verified wages while the paperwork clears, so the site keeps running. PAYE, NSSF, SHIF and the Affordable Housing Levy are calculated in the same run and ready for filing by the 9th.

Frequently asked questions

Do you have an office in Machakos?

No. FundiPay has no branches — the platform runs remotely. Wages are paid by M-Pesa B2C, which works countrywide, so a site in Athi River or Machakos town is paid the same way as one in Nairobi.

Can you pay workers who come in from Kitui or Wote?

Yes. Payment goes to the worker's own M-Pesa number wherever they live. Only check-in is tied to the site, and it must happen inside the 50-metre geofence at the gate.

How does FundiPay help with ghost workers on subcontractor gangs?

Gang members are checked in individually against verified ID and phone numbers, and the muster roll is locked before payroll runs. A name that never checked in cannot be paid, which removes the main way ghost workers enter a site.

Keep reading

Pay every fundi on Friday

Direct M-Pesa B2C, geofenced muster rolls and a 14-day payroll float — built for Kenyan construction sites. Bila ya kutoa.